Main and Emergency Power Distribution Switchboards
SELMA implements the design, development and retrofit installations of Ship Power Plant Distribution Switchboards and Power Management Control Systems worldwide:
- PMS – Power Management System
- MSB – Main Power Distribution Switchboards
- ESB – Emergency Power Distribution Switchboards
- Group Starters / Soft Starter Panels
- Auxiliary Power Distribution Boards
Before
After
SELMA engineering teams implement ship specific studies and analysis on Power Plant Conversion (i.e. Additional Gensets Installation, Switchboards Modifications):
Short Circuit Calculation Study
Load Analysis Study
Power Factor Compensation Analysis
SELMA implements the design, development and retrofit upgrade on existing Generator Power Distribution Boards with the installation of New PMS Power Management Systems based on the as fitted drawings of Power Plant:
- Automatic Synchronizing
- Automatic Loading Sharing
- Automatic Start/Stop/Stby Generators according to Load Demands
- Large Motors Automatic Blocking
- PMS Functions and Monitoring with Load Analysis Illustration
- 3 Phase Management, Voltage Matching
- Redundant Power Distribution
- Frequency Control
MSB Main Switchboards